NHS Health Centres

Planned & Reactive Maintenance

We ensure a comfortable and safe environment for patients and staff for the North East London NHS Foundation Trust (NELFT).

As a trusted provider, our expertise extends to servicing and maintaining various mechanical plant systems, including boilers and heating systems, air conditioning, and ventilation plant.

Additionally, we have collaborated with the NELFT to develop plant lifecycle replacement plans and successfully completed a plant upgrade and replacement project at each of the ten health centres covered by the contract.

We provide comprehensive maintenance and servicing for critical mechanical plant systems, including boilers and heating systems, air conditioning, and ventilation plant. Regular SFG20 compliant inspections, repairs, and cleaning of these systems ensure their optimal performance and energy efficiency.

Our focus on energy-efficient equipment and plant lifecycle replacement plans aligns with the NELFT’s sustainability goals. We contribute to their reductions in energy consumption and by promoting responsible equipment replacement.

East West Connect have completed each of their lifecycle projects in a manner that has mitigated any disruption to the services that we provide, and they’ve done so in a friendly manner.

North East London NHS Foundation Trust

By replacing aging equipment with modern, energy-efficient systems, we have contributed to long-term cost savings.

The plant upgrade and replacement project has resulted in improved energy efficiency, reducing operational costs for the health centres, which has been vital during the cost of livng crisis.

Project breakdown

  • Mechanical 90% 90%
  • Electrical 10% 10%
  • Public Health 0% 0%

Similar works