Our team is replacing faulty LED strips on the building’s façade and swapping out 58 control boxes on the terrace – a job that demands precision, planning, and a touch of creative flair.
To reach every part of the façade safely, our engineers are working with a 26m static boom lift. The equipment supplier was on-site to deliver a full demonstration, provide detailed operating instructions, and answer all our technical questions – ensuring our crew could work with complete confidence. With safety as our top priority, we were fully prepared to get the job done efficiently and securely.
Soon, Brixton House Theatre will be shining brightly once more – a fitting backdrop for the creativity and culture it celebrates every day.