The works included the conversion of an old loading bay into a modern reception area, with the services and lighting being used as the main architectural features. We worked hand in hand with the architect to turn the 3 office floors into a modern space capable of being divided into multiple modules.

The rejuvenation works also included the upgrade and refurbishment of the existing Versatemp heating and cooling system on the 4th and 5th floors, as well as the extension of the system to the 6th floor. We engineered an advanced controls strategy to integrate the new cooling arrangement into the existing BMS system.

The fast track project was delivered to a tight programme with zero disruption to the live areas and services ensuring no downtime for the existing NHS tenants.