The works at 25 Bedford Street were centred around the replacement of two old cast iron 400kW boilers, with a high efficiency 8 module boiler system, and an all new pump and header arrangement.

Due to access constraints, we were unable to use a crane lift for the strip out and delivery of the new plant. Our in-house operatives and plant movement team stripped out the existing plant and pipework into safe, manageable components and disposed of them using a roll-on-roll-off skip during out of hours periods. New items of plant were delivered on a flat pack basis and distributed throughout the site during out of hours periods. The works also included the installation of a new flue system to accompany the new boilers.